APPENDIX A - VFD CENTRIFUGE HMI SERVER SYSTEM
A-4 15 May 13
Appendix A-HMIServerSystem
Control Cabinet Connections to Router Switchgear Box
The following procedure describes the interconnection of control cabinets with the HMI Server.
Refer to drawing 18309-00 for additional assistance in making the connections, and note that
cables must be no more 328’ (100m) long. All cabling must be properly dressed, protected from
chafing, and secured appropriately.
1. Remove the 1” NPT pipe plug from fitting at left upper left side of each control cabinet, and
install a cable gland in its place.
2. Route a CAT5 cable through each cable gland to the Ethernet switch at the upper rear of the
control cabinet, and connect cable to open port at upper left of switch (Figure A-4).
3. Install a customer-supplied 3/4” cable gland in a Router Switchgear Box opening for each
centrifuge to be monitored.
Figure A-4. Ethernet Switch Connection Port
4. Route free end of each CAT5 cable through a cable gland in Router Switchgear Box, and
connect to open port of each router (Figure A-5).
Figure A5. Ethernet Connections to Routers